Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMG
4.2%
OF COST SPENT
₹3.19 L spent
of ₹75.85 L sanctioned
₹72.66 L still to spend
on 18 ongoing works
Works ongoing
18
Open the list of these works →
Sanctioned
₹75.85 L
Pure scheme (wage + material)
Expenditure since inception
₹3.19 L
4.2% of sanction
Balance cost (unspent)
₹72.66 L
Wage₹19.11 L
Material₹53.55 L
Trend

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Lakh