Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Well
0.4%
OF COST SPENT
₹2.03 L spent
of ₹4.76 Cr sanctioned
₹4.74 Cr still to spend
on 178 ongoing works
Works ongoing
178
Open the list of these works →
Sanctioned
₹4.76 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.03 L
0.4% of sanction
Balance cost (unspent)
₹4.74 Cr
Wage₹2.11 Cr
Material₹2.63 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Bhind — Bhind ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore