Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGFarm Pond
38.6%
OF COST SPENT
₹5.28 Cr spent
of ₹13.69 Cr sanctioned
₹8.41 Cr still to spend
on 669 ongoing works
Works ongoing
669
Open the list of these works →
Sanctioned
₹13.69 Cr
Pure scheme (wage + material)
Expenditure since inception
₹5.28 Cr
38.6% of sanction
Balance cost (unspent)
₹8.41 Cr
Wage₹6.02 Cr
Material₹2.39 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore