Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Water Drain/Diversion Channel/Drainage/Field Channel
33.4%
OF COST SPENT
₹10.87 Cr spent
of ₹32.55 Cr sanctioned
₹21.68 Cr still to spend
on 593 ongoing works
Works ongoing
593
Open the list of these works →
Sanctioned
₹32.55 Cr
Pure scheme (wage + material)
Expenditure since inception
₹10.87 Cr
33.4% of sanction
Balance cost (unspent)
₹21.68 Cr
Wage₹12.18 Cr
Material₹9.50 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By district

Amounts in ₹ Crore