Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Tank
27.9%
OF COST SPENT
₹86.50 L spent
of ₹3.10 Cr sanctioned
₹2.24 Cr still to spend
on 64 ongoing works
Works ongoing
64
Open the list of these works →
Sanctioned
₹3.10 Cr
Pure scheme (wage + material)
Expenditure since inception
₹86.50 L
27.9% of sanction
Balance cost (unspent)
₹2.24 Cr
Wage₹1.61 Cr
Material₹63.05 L
Trend · statewide

—
—
Slowest spending this FY · worth a look
Dhar — Tirla −₹8.26 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore