Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMG
42.1%
OF COST SPENT
₹5.85 L spent
of ₹13.90 L sanctioned
₹8.04 L still to spend
on 18 ongoing works
Works ongoing
18
Open the list of these works →
Sanctioned
₹13.90 L
Pure scheme (wage + material)
Expenditure since inception
₹5.85 L
42.1% of sanction
Balance cost (unspent)
₹8.04 L
Wage₹6.88 L
Material₹1.16 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh