Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
64.7%
OF COST SPENT
₹1.22 Cr spent
of ₹1.88 Cr sanctioned
₹66.47 L still to spend
on 12 ongoing works
Works ongoing
12
Open the list of these works →
Sanctioned
₹1.88 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.22 Cr
64.7% of sanction
Balance cost (unspent)
₹66.47 L
Wage₹13.92 L
Material₹52.55 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore