Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
23.4%
OF COST SPENT
₹76,575 spent
of ₹3.27 L sanctioned
₹2.50 L still to spend
on 1 ongoing works
Works ongoing
1
Open the list of these works →
Sanctioned
₹3.27 L
Pure scheme (wage + material)
Expenditure since inception
₹76,575
23.4% of sanction
Balance cost (unspent)
₹2.50 L
Wage₹1.98 L
Material₹52,182
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh