Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
37.8%
OF COST SPENT
₹2.33 Cr spent
of ₹6.18 Cr sanctioned
₹3.85 Cr still to spend
on 41 ongoing works
Works ongoing
41
Open the list of these works →
Sanctioned
₹6.18 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.33 Cr
37.8% of sanction
Balance cost (unspent)
₹3.85 Cr
Wage₹60.38 L
Material₹3.24 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore