Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Well
45.7%
OF COST SPENT
₹1.18 Cr spent
of ₹2.58 Cr sanctioned
₹1.40 Cr still to spend
on 86 ongoing works
Works ongoing
86
Open the list of these works →
Sanctioned
₹2.58 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.18 Cr
45.7% of sanction
Balance cost (unspent)
₹1.40 Cr
Wage₹46.10 L
Material₹93.64 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh