Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGCattle Shed
0.5%
OF COST SPENT
₹2.42 L spent
of ₹4.94 Cr sanctioned
₹4.92 Cr still to spend
on 14 ongoing works
Works ongoing
14
Open the list of these works →
Sanctioned
₹4.94 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.42 L
0.5% of sanction
Balance cost (unspent)
₹4.92 Cr
Wage₹55.00 L
Material₹4.37 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Crore