Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
2.8%
OF COST SPENT
₹8,746 spent
of ₹3.15 L sanctioned
₹3.06 L still to spend
on 1 ongoing works
Works ongoing
1
Open the list of these works →
Sanctioned
₹3.15 L
Pure scheme (wage + material)
Expenditure since inception
₹8,746
2.8% of sanction
Balance cost (unspent)
₹3.06 L
Wage₹1.89 L
Material₹1.17 L