Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Road and Culvert
1.7%
OF COST SPENT
₹15.23 L spent
of ₹9.08 Cr sanctioned
₹8.93 Cr still to spend
on 47 ongoing works
Works ongoing
47
Open the list of these works →
Sanctioned
₹9.08 Cr
Pure scheme (wage + material)
Expenditure since inception
₹15.23 L
1.7% of sanction
Balance cost (unspent)
₹8.93 Cr
Wage₹1.89 Cr
Material₹7.03 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore