Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Crematorium
0.1%
OF COST SPENT
₹10,500 spent
of ₹1.58 Cr sanctioned
₹1.58 Cr still to spend
on 63 ongoing works
Works ongoing
63
Open the list of these works →
Sanctioned
₹1.58 Cr
Pure scheme (wage + material)
Expenditure since inception
₹10,500
0.1% of sanction
Balance cost (unspent)
₹1.58 Cr
Wage₹29.71 L
Material₹1.29 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
BHIND — BHIND ₹43,128
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh