Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstr of Aganwadi
74%
OF COST SPENT
₹3.08 Cr spent
of ₹4.17 Cr sanctioned
₹1.08 Cr still to spend
on 57 ongoing works
Works ongoing
57
Open the list of these works →
Sanctioned
₹4.17 Cr
Pure scheme (wage + material)
Expenditure since inception
₹3.08 Cr
74% of sanction
Balance cost (unspent)
₹1.08 Cr
Wage₹20.96 L
Material₹87.32 L
Trend · statewide

—
—
Slowest spending this FY · worth a look
Bhind — Ater ₹15.77 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore