Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
68.1%
OF COST SPENT
₹1.33 Cr spent
of ₹1.95 Cr sanctioned
₹62.37 L still to spend
on 13 ongoing works
Works ongoing
13
Open the list of these works →
Sanctioned
₹1.95 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.33 Cr
68.1% of sanction
Balance cost (unspent)
₹62.37 L
Wage₹26.33 L
Material₹36.05 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Alirajpur — Jobat ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh