Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstr of Gabion
4.2%
OF COST SPENT
₹77,819 spent
of ₹18.64 L sanctioned
₹17.86 L still to spend
on 12 ongoing works
Works ongoing
12
Open the list of these works →
Sanctioned
₹18.64 L
Pure scheme (wage + material)
Expenditure since inception
₹77,819
4.2% of sanction
Balance cost (unspent)
₹17.86 L
Wage₹2.13 L
Material₹15.73 L
Trend · statewide

—
—
Slowest spending this month · worth a look
Indore — Mhow −₹30.65 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh