Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAFarm Pond
16.8%
OF COST SPENT
₹55.58 L spent
of ₹3.30 Cr sanctioned
₹2.75 Cr still to spend
on 118 ongoing works
Works ongoing
118
Open the list of these works →
Sanctioned
₹3.30 Cr
Pure scheme (wage + material)
Expenditure since inception
₹55.58 L
16.8% of sanction
Balance cost (unspent)
₹2.75 Cr
Wage₹2.18 Cr
Material₹56.95 L
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh