Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Well
21.5%
OF COST SPENT
₹85,840 spent
of ₹4.00 L sanctioned
₹3.14 L still to spend
on 2 ongoing works
Works ongoing
2
Open the list of these works →
Sanctioned
₹4.00 L
Pure scheme (wage + material)
Expenditure since inception
₹85,840
21.5% of sanction
Balance cost (unspent)
₹3.14 L
Wage₹1.48 L
Material₹1.66 L
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh