Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
0.2%
OF COST SPENT
₹408 spent
of ₹2.02 L sanctioned
₹2.01 L still to spend
on 1 ongoing works
Works ongoing
1
Open the list of these works →
Sanctioned
₹2.02 L
Pure scheme (wage + material)
Expenditure since inception
₹408
0.2% of sanction
Balance cost (unspent)
₹2.01 L
Wage₹45,970
Material₹1.55 L