Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
43.3%
OF COST SPENT
₹5.42 Cr spent
of ₹12.53 Cr sanctioned
₹7.11 Cr still to spend
on 141 ongoing works
Works ongoing
141
Open the list of these works →
Sanctioned
₹12.53 Cr
Pure scheme (wage + material)
Expenditure since inception
₹5.42 Cr
43.3% of sanction
Balance cost (unspent)
₹7.11 Cr
Wage₹3.15 Cr
Material₹3.96 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore