Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
76.1%
OF COST SPENT
₹19.90 Cr spent
of ₹26.15 Cr sanctioned
₹6.24 Cr still to spend
on 153 ongoing works
Works ongoing
153
Open the list of these works →
Sanctioned
₹26.15 Cr
Pure scheme (wage + material)
Expenditure since inception
₹19.90 Cr
76.1% of sanction
Balance cost (unspent)
₹6.24 Cr
Wage₹2.13 Cr
Material₹4.11 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
Dhar — Tirla −₹8.26 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore