Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Tank
62.4%
OF COST SPENT
₹8.17 Cr spent
of ₹13.10 Cr sanctioned
₹4.93 Cr still to spend
on 162 ongoing works
Works ongoing
162
Open the list of these works →
Sanctioned
₹13.10 Cr
Pure scheme (wage + material)
Expenditure since inception
₹8.17 Cr
62.4% of sanction
Balance cost (unspent)
₹4.93 Cr
Wage₹3.06 Cr
Material₹1.86 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore