Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Well
42%
OF COST SPENT
₹39.75 L spent
of ₹94.71 L sanctioned
₹54.95 L still to spend
on 25 ongoing works
Works ongoing
25
Open the list of these works →
Sanctioned
₹94.71 L
Pure scheme (wage + material)
Expenditure since inception
₹39.75 L
42% of sanction
Balance cost (unspent)
₹54.95 L
Wage₹19.53 L
Material₹35.42 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh