Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGGoat Shelter
6.4%
OF COST SPENT
₹40,520 spent
of ₹6.34 L sanctioned
₹5.94 L still to spend
on 9 ongoing works
Works ongoing
9
Open the list of these works →
Sanctioned
₹6.34 L
Pure scheme (wage + material)
Expenditure since inception
₹40,520
6.4% of sanction
Balance cost (unspent)
₹5.94 L
Wage₹66,638
Material₹5.27 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type