Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Tank
0.3%
OF COST SPENT
₹2.32 L spent
of ₹7.18 Cr sanctioned
₹7.16 Cr still to spend
on 109 ongoing works
Works ongoing
109
Open the list of these works →
Sanctioned
₹7.18 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.32 L
0.3% of sanction
Balance cost (unspent)
₹7.16 Cr
Wage₹4.93 Cr
Material₹2.23 Cr
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Indore — Mhow −₹30.65 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore