Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Well
46.9%
OF COST SPENT
₹2.25 Cr spent
of ₹4.79 Cr sanctioned
₹2.55 Cr still to spend
on 180 ongoing works
Works ongoing
180
Open the list of these works →
Sanctioned
₹4.79 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.25 Cr
46.9% of sanction
Balance cost (unspent)
₹2.55 Cr
Wage₹64.38 L
Material₹1.90 Cr
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh