Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Bund
33%
OF COST SPENT
₹63.38 L spent
of ₹1.92 Cr sanctioned
₹1.29 Cr still to spend
on 33 ongoing works
Works ongoing
33
Open the list of these works →
Sanctioned
₹1.92 Cr
Pure scheme (wage + material)
Expenditure since inception
₹63.38 L
33% of sanction
Balance cost (unspent)
₹1.29 Cr
Wage₹73.65 L
Material₹54.90 L
Trend · statewide

—
—
Slowest spending this FY · worth a look
Dhar — Tirla −₹8.26 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh