Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstr of GP Bhawan
62.6%
OF COST SPENT
₹1.49 Cr spent
of ₹2.38 Cr sanctioned
₹88.98 L still to spend
on 27 ongoing works
Works ongoing
27
Open the list of these works →
Sanctioned
₹2.38 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.49 Cr
62.6% of sanction
Balance cost (unspent)
₹88.98 L
Wage₹51.90 L
Material₹37.08 L
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore