Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Trench
26.5%
OF COST SPENT
₹1.64 Cr spent
of ₹6.17 Cr sanctioned
₹4.53 Cr still to spend
on 151 ongoing works
Works ongoing
151
Open the list of these works →
Sanctioned
₹6.17 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.64 Cr
26.5% of sanction
Balance cost (unspent)
₹4.53 Cr
Wage₹3.72 Cr
Material₹81.53 L
Trend · statewide

—
—
Slowest spending this FY · worth a look
Dhar — Tirla −₹8.26 Cr
Top 10 new work types

Ranked by sanctioned cost