Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of NADEP/Vermi Compost Pit
13.5%
OF COST SPENT
₹1.56 L spent
of ₹11.51 L sanctioned
₹9.95 L still to spend
on 29 ongoing works
Works ongoing
29
Open the list of these works →
Sanctioned
₹11.51 L
Pure scheme (wage + material)
Expenditure since inception
₹1.56 L
13.5% of sanction
Balance cost (unspent)
₹9.95 L
Wage₹26,577
Material₹9.69 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Lakh