Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
33.6%
OF COST SPENT
₹2.52 Cr spent
of ₹7.48 Cr sanctioned
₹4.97 Cr still to spend
on 127 ongoing works
Works ongoing
127
Open the list of these works →
Sanctioned
₹7.48 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.52 Cr
33.6% of sanction
Balance cost (unspent)
₹4.97 Cr
Wage₹2.45 Cr
Material₹2.52 Cr
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore