Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstr of GP Bhawan
33.6%
OF COST SPENT
₹1.06 Cr spent
of ₹3.16 Cr sanctioned
₹2.10 Cr still to spend
on 26 ongoing works
Works ongoing
26
Open the list of these works →
Sanctioned
₹3.16 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.06 Cr
33.6% of sanction
Balance cost (unspent)
₹2.10 Cr
Wage₹56.07 L
Material₹1.54 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Alirajpur — Jobat ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore