Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Tank
0.1%
OF COST SPENT
₹2.85 L spent
of ₹19.77 Cr sanctioned
₹19.74 Cr still to spend
on 145 ongoing works
Works ongoing
145
Open the list of these works →
Sanctioned
₹19.77 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.85 L
0.1% of sanction
Balance cost (unspent)
₹19.74 Cr
Wage₹12.74 Cr
Material₹7.00 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
BURHANPUR — KHAKNAR ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore