Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
58.6%
OF COST SPENT
₹14.63 L spent
of ₹24.97 L sanctioned
₹10.34 L still to spend
on 1 ongoing works
Works ongoing
1
Open the list of these works →
Sanctioned
₹24.97 L
Pure scheme (wage + material)
Expenditure since inception
₹14.63 L
58.6% of sanction
Balance cost (unspent)
₹10.34 L
Wage₹3.54 L
Material₹6.80 L