Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGCattle Shed
0.5%
OF COST SPENT
₹2.66 L spent
of ₹5.87 Cr sanctioned
₹5.85 Cr still to spend
on 142 ongoing works
Works ongoing
142
Open the list of these works →
Sanctioned
₹5.87 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.66 L
0.5% of sanction
Balance cost (unspent)
₹5.85 Cr
Wage₹1.60 Cr
Material₹4.24 Cr
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Indore — Mhow −₹30.65 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore