Data as of 29 Oct 2026, 06:52 Admin login
FY
Reset

Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
0.4%
OF COST SPENT
₹41.18 L spent
of ₹103.85 Cr sanctioned
₹103.43 Cr still to spend
on 447 ongoing works
Works ongoing
447
Open the list of these works →
Sanctioned
₹103.85 Cr
Pure scheme (wage + material)
Expenditure since inception
₹41.18 L
0.4% of sanction
Balance cost (unspent)
₹103.43 Cr
Wage₹29.61 Cr
Material₹73.82 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore