Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstr of GP Bhawan
42.1%
OF COST SPENT
₹50.25 L spent
of ₹1.19 Cr sanctioned
₹69.13 L still to spend
on 35 ongoing works
Works ongoing
35
Open the list of these works →
Sanctioned
₹1.19 Cr
Pure scheme (wage + material)
Expenditure since inception
₹50.25 L
42.1% of sanction
Balance cost (unspent)
₹69.13 L
Wage₹21.76 L
Material₹47.36 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh