Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA
45%
OF COST SPENT
₹46.39 Cr spent
of ₹103.00 Cr sanctioned
₹56.61 Cr still to spend
on 4,263 ongoing works
Works ongoing
4,263
Open the list of these works →
Sanctioned
₹103.00 Cr
Pure scheme (wage + material)
Expenditure since inception
₹46.39 Cr
45% of sanction
Balance cost (unspent)
₹56.61 Cr
Wage₹22.23 Cr
Material₹34.37 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore