Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Tank
25%
OF COST SPENT
₹59.99 L spent
of ₹2.40 Cr sanctioned
₹1.80 Cr still to spend
on 22 ongoing works
Works ongoing
22
Open the list of these works →
Sanctioned
₹2.40 Cr
Pure scheme (wage + material)
Expenditure since inception
₹59.99 L
25% of sanction
Balance cost (unspent)
₹1.80 Cr
Wage₹1.06 Cr
Material₹74.17 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh