Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
50.4%
OF COST SPENT
₹6.55 L spent
of ₹13.00 L sanctioned
₹6.44 L still to spend
on 1 ongoing works
Works ongoing
1
Open the list of these works →
Sanctioned
₹13.00 L
Pure scheme (wage + material)
Expenditure since inception
₹6.55 L
50.4% of sanction
Balance cost (unspent)
₹6.44 L
Wage₹13,727
Material₹6.31 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh