Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGRepair & maint of Pond/ Tank
0.3%
OF COST SPENT
₹72,000 spent
of ₹2.08 Cr sanctioned
₹2.07 Cr still to spend
on 54 ongoing works
Works ongoing
54
Open the list of these works →
Sanctioned
₹2.08 Cr
Pure scheme (wage + material)
Expenditure since inception
₹72,000
0.3% of sanction
Balance cost (unspent)
₹2.07 Cr
Wage₹1.45 Cr
Material₹62.16 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Narmadapuram — Hoshangabad ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore