Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Well
54%
OF COST SPENT
₹35.77 Cr spent
of ₹66.29 Cr sanctioned
₹30.52 Cr still to spend
on 2,292 ongoing works
Works ongoing
2,292
Open the list of these works →
Sanctioned
₹66.29 Cr
Pure scheme (wage + material)
Expenditure since inception
₹35.77 Cr
54% of sanction
Balance cost (unspent)
₹30.52 Cr
Wage₹8.74 Cr
Material₹21.78 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
BHIND — ATER ₹15.77 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore