Ongoing works in VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMG
3.7%
OF COST SPENT
₹47,100 spent
of ₹12.69 L sanctioned
₹12.22 L still to spend
on 47 ongoing works
Works ongoing
47
Open the list of these works →
Sanctioned
₹12.69 L
Pure scheme (wage + material)
Expenditure since inception
₹47,100
3.7% of sanction
Balance cost (unspent)
₹12.22 L
Wage₹12.22 L
Material₹0
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh