Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstr of Cement Concrete Roads
0.4%
OF COST SPENT
₹10.12 L spent
of ₹27.36 Cr sanctioned
₹27.26 Cr still to spend
on 431 ongoing works
Works ongoing
431
Open the list of these works →
Sanctioned
₹27.36 Cr
Pure scheme (wage + material)
Expenditure since inception
₹10.12 L
0.4% of sanction
Balance cost (unspent)
₹27.26 Cr
Wage₹14.54 Cr
Material₹12.71 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
NARMADAPURAM — HOSHANGABAD ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore