Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMG
2.2%
OF COST SPENT
₹1.33 L spent
of ₹59.95 L sanctioned
₹58.62 L still to spend
on 78 ongoing works
Works ongoing
78
Open the list of these works →
Sanctioned
₹59.95 L
Pure scheme (wage + material)
Expenditure since inception
₹1.33 L
2.2% of sanction
Balance cost (unspent)
₹58.62 L
Wage₹43.50 L
Material₹15.12 L
Trend

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By district

Amounts in ₹ Lakh