Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Trench
37.7%
OF COST SPENT
₹1.53 Cr spent
of ₹4.06 Cr sanctioned
₹2.53 Cr still to spend
on 133 ongoing works
Works ongoing
133
Open the list of these works →
Sanctioned
₹4.06 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.53 Cr
37.7% of sanction
Balance cost (unspent)
₹2.53 Cr
Wage₹1.94 Cr
Material₹59.19 L
Trend · statewide

—
—
Slowest spending this FY · worth a look
Bhind — Ater ₹15.77 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore