Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Road and Culvert
4.2%
OF COST SPENT
₹4.95 L spent
of ₹1.18 Cr sanctioned
₹1.13 Cr still to spend
on 3 ongoing works
Works ongoing
3
Open the list of these works →
Sanctioned
₹1.18 Cr
Pure scheme (wage + material)
Expenditure since inception
₹4.95 L
4.2% of sanction
Balance cost (unspent)
₹1.13 Cr
Wage₹40.78 L
Material₹71.93 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Narmadapuram — Hoshangabad ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh