Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Percolation Tank
7.5%
OF COST SPENT
₹23,174 spent
of ₹3.10 L sanctioned
₹2.87 L still to spend
on 1 ongoing works
Works ongoing
1
Open the list of these works →
Sanctioned
₹3.10 L
Pure scheme (wage + material)
Expenditure since inception
₹23,174
7.5% of sanction
Balance cost (unspent)
₹2.87 L
Wage₹2.24 L
Material₹63,692
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Lakh