Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGFarm Pond
41.9%
OF COST SPENT
₹8.23 Cr spent
of ₹19.65 Cr sanctioned
₹11.42 Cr still to spend
on 940 ongoing works
Works ongoing
940
Open the list of these works →
Sanctioned
₹19.65 Cr
Pure scheme (wage + material)
Expenditure since inception
₹8.23 Cr
41.9% of sanction
Balance cost (unspent)
₹11.42 Cr
Wage₹9.04 Cr
Material₹2.38 Cr
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore